GROUTING SYSTEM
CIS PU INJECTION
THREE COMPONENT PU BASED INJECTION GROUT
PRODUCT CATEGORY: POLYURETHENE GROUTING SYSTEM
Product Discription
CIS PU INJECTION is based on MDI (Methylene
Diphenyl iso cyanate) polyurethane pre- polymer &
accelerator. The system only reacts when it comes in
contact with water, producing a relatively stiff & inert
polyurathane foam. It is a 100% solid & solvent free
polyurethane grout for quick temperrory closing &
sealing of water bearing cracks, cavities and leaks
under hydrostatic pressure. The systems foams to 30-
40 times its volume in the presence of water & can be
an effective means of arresting running water
seepage.
Areas Of Application
Water stop system for running water
in Defective concrete – (crack &
honeycomb)
- Concrete joints
- Drinking water tanks & reservoirs
- Waste water tank
- Sewers, manholes, utility boxes, etc
- Dams & canals
- Tunnels
- Brick / stone masonry
- Pipe intrusions
- Soil stabilization
Features & Benefits
- Viscosity – Very low viscosity benefits penetration into hairline cracks
- Solids – 100% solid & solvent free composition helps in shrinkage free grout
- Foaming – On reaction with water foams around 30 times which benefits filling of wider
cracks & honey
combing of concrete structures (hydrophobic in nature)
- Bonding – Bonds strongly to dry & wet concrete, bricks & stones
- Hygiene - It is safe & suitable for drinking water contact
- Non-toxic – It is CFC & solvent free hence non-toxic
Surface Preparation
CIS PU Injection is a high quality, low viscous PU injection foam resin which on contact with
water expands its
volume & cures to very dense, rigid & flexible foam with a very fine cellulose structure
- Due to its high capillary penetration and activity in damp & water bearing structure, it
seals the cracks of more than 0.2 mm in built, hence the material is ideal for filling
gaps & cavities at constant mixing stability
On contact with water, the foam formation begins after approximately 15 seconds at
ambient temperature
- The reaction speed depends on temperature of the mixed material, building structure &
contact water.
Temperature more than 200C accelerates the foam formation & curing
- Prior to injection procedure check the nature of building structure, type of cracks and
hydrostatic conditions
& water quality. Clean the cracks & crack edges so that the source of water leakage can
be detected
- Remove all spalled layers of plasters from the area of the injection level and patch
all joints and defective
brickwork with quick drying cement mortar. Drill holes taking into consideration the
actual size (thickness) of
the wall/concrete member and the size & length of injection packers to be used. The
packers must be fixed
tightly in the drill holes
- In the case of crack injections into brickwork and horizontal water stops, drill the
holes into the bricks to
ensure that the mechanical packers are fastened tightly. When tightening the packers,
make sure that the
injection hose rests comfortably on the zerk or button head fittings
Mixing
Empty components A and B which are provided according to the required mixing ratio of 10:1
(parts by volume)
or measured out in separate containers by the user - completely into a mixing vessel and mix
homogeneously.
Application - Injection Procedure
- CIS PU Injection resin is a low viscous material, to be injected by means of a single or
two component
injection pump
- Mixed material must be used immediately because high air humidity may cause a skin
formation over the
material surface. In case skin is formed, remove the skin prior to use of the material
otherwise the pump will
get chocked
- The workability of the mix is approximately 2–3 hours. Start injecting at a pressure
depending upon the
nature of the building structure, hydrodynamic & hydrostatic condition and the desired
depth of penetration
- Carry out the injection at intervals so that it can be concluded from the reaction of
the material with moisture
inside and decided whether to continue or stop the injection process.
- The material can be injected at temperature of more than 50C. The best results can be
achieved between 15
to 25OC. Higher initial temperatures accelerate the reaction. For durable & complete
crack sealing, a
secondary injection using CIS PU Injection is necessary depending on the object. The
secondary crack
injection usually is carried out through the same holes. In case the secondary injection
is carried out much
later then it may be necessary to install new packers in different position
Final Work
After the curing process of the injection resin (approx. 24 hours after the injection),
remove the packers and close
the drill holes with suitable mineral building materials (quick-binding cement, swelling
mortar)
Packaging
5 kg , 25 kg
Precautions & Limitations
To achieve desired performance kindly mix the entire quantity in one go as it will ensure the
consistency of the
mix.